lauantai 18. kesäkuuta 2011
Soil Profile
June 17, 2011:
On Friday, we were done with most of our trenches. Joseph, Colin, Babar, and Riku were in the T111A, T111B, T111D, and T111E drawing soil profile of the walls. Meanwhile, Alesia was digging further down on T111C trench. Overall, the team finished up most of the soil profiles for the trenches and T111C trench continues to go further down.
Tilaa:
Lähetä kommentteja (Atom)
Ei kommentteja:
Lähetä kommentti